Tools/DWT Readiness Checker/How to use
Free · 2 minutes · Mandatory from 1 Oct 2026

How to use the DWT Readiness Checker

Answer 8 questions about your current waste practices and get a readiness score for the DEFRA Digital Waste Tracking mandate — mandatory for all construction sites from 1 October 2026. Takes 2 minutes.

Check your DWT readiness

What the score levels mean

Ready
13–14 points
Practices align with DWT requirements. Focus on formalising documentation.
Partially ready
8–12 points
Some practices in place but gaps remain. Address Partially/No answers before Oct 2026.
Not ready
Below 8
Significant gaps. Immediate action needed — use the action plan as your starting point.

Step-by-step

1

Open the DWT Readiness Checker

Go to the free checker — no account or sign-up required. Takes about 2 minutes.

2

Answer all 8 questions honestly

For each question, choose Yes, Partially, or No based on what you actually do today — not what you intend to do. The checker covers digital logging, EWC codes, weight recording, carrier verification, destination facility logging, WTN retention, mobile access, and reporting.

Answer based on your current practice, not your plans. The action plan only helps if the score reflects reality.

3

Click "See my readiness score"

The button activates once all 8 questions are answered. Click it to submit and see your result.

4

Read your readiness level

Your score and level — Ready, Partially ready, or Not ready — appear with a summary of what it means for your October 2026 compliance.

5

Review your action plan

For every Partially or No answer, the checker shows a specific action step. Each action is practical and implementable before October 2026. You can also retake the checker to track your progress as you make improvements.

Frequently asked questions

What is the Digital Waste Tracking mandate?

A DEFRA regulation under the Environment Act 2021 requiring all waste receiving sites in England to record waste movements digitally from 1 October 2026. Paper WTNs and spreadsheets become non-compliant.

Who does it apply to?

Technically waste receiving sites, but in practice all construction contractors sending waste to licensed facilities in England need a compliant digital system from October 2026 — receiving sites will require digital load information.

What does my score mean?

13–14 points = Ready. 8–12 = Partially ready, gaps need addressing. Below 8 = Not ready, significant changes needed before October 2026.

What counts as a digital waste record under DWT?

A record created at the point of collection with: waste type and EWC code, estimated weight, carrier name and licence number, destination facility, and date/time. A spreadsheet updated in the office does not qualify.

What if I am not compliant by October 2026?

The Environment Agency can issue fixed penalty notices and pursue prosecution for non-compliance. The EA fined over £8.5 million in construction enforcement actions in 2025 alone.

What is an EWC code?

A six-digit European Waste Catalogue code classifying waste by type. Every DWT movement must include the EWC code. Common ones: 17 01 01 (concrete), 17 02 01 (timber), 17 04 05 (steel), 17 09 04 (mixed C&D waste).

WasteMapper fixes every gap in your action plan

Digital logs, carrier verification, EWC codes, weight capture, WTN storage, and monthly reports — built into one mobile-first platform. Free plan available.

Check readiness Get DWT-ready with WasteMapper

Related guides

How to check a carrier licenceHow to use the BREEAM Wst01 CalculatorDigital Waste Tracking 2026 guide

© 2026 NGA Dynamics Ltd · Privacy